This school, which sits in the shadow of St Paul’s Cathedral, was being refurbished. We were contracted to carry out the asbestos removal and strip out works. We were also asked to install temporary works to enable the removal of structural works. The works were carried out in two visits, during the summer and Christmas holidays, to minimise disturbance to the school.